All work
will bank2023Staff Product Designer, Credit Card

Switching the brain: the migration that wasn’t meant to change anything for customers, and changed their bill

A back-end migration with nothing for customers to see ended up shipping four things they use: a real-time open bill, past and future bills in the app, early payment of instalments with a discount and planning before buying. In a controlled rollout, CSAT and NPS were higher and support contacts lower in the test group. As Staff Product Designer on the credit card, I read the support tickets, interviewed customers and found that they plan their lives around the bill, which the old setup didn’t let them do.

A/BRolled out against a control group
CSAT & NPS ↑Higher in the test group than in control
Contacts ↓Fewer tickets in the test group
  • Credit card
  • Product strategy
  • Temporal Control
credit card
Company
will bank, a digital bank for lower-income Brazilians, with millions of customers
My role
Staff Product Designer, Credit Card
Worked with
Engineering, Product, leadership, and Mastercard for benchmarking
Timeline
2023
What I owned
  • Treating the migration as a product opportunity, with the team
  • AI-assisted contact-rate analysis
  • Interviews
  • Benchmark with Mastercard
  • Leadership workshop
  • Prototypes & usability tests
  • Temporal Control screens
  • Backlog influence

01 · Context

Our credit card ran on someone else’s processor.

will bank used an outsourced processor to orchestrate every credit card operation. That got the bank to market quickly, but it also made basic tasks unstable and kept our transaction approval rate below the main competitors’.

Lowertransaction approval rate than the main competitorsA cost of the outsourced setup
Lost volumetransactions the bank was failing to process every monthFigures withheld
1 brainThe processor orchestrated every card operation. The team decided to bring its most critical part in-house: the authorizer.A change in the core of the card

Replacing the whole processor was too big a job, so the team decided to bring in-house the part that caused the most problems, the authorizer. On paper, it was an infrastructure project with nothing for customers to see.

The opportunity

On paper it was a back-end migration. We saw a chance to give customers control over their bill’s timeline.

How might we use the new authorizer so customers know what they’ve paid, what they’re paying and what they’ll pay?

Beyond approval rates, the team saw the authorizer as a chance to make customers happier and the card more competitive. Engineering built the authorizer. My part was finding out what customers could gain from it and designing that: the ticket analysis, the interviews, the benchmark with Mastercard, the workshop with leadership, the prototypes and tests, and the Temporal Control screens. The work ran in six stages, each adding a point of view before anything reached the backlog.

How the work ran · six stages Each stage added a perspective before anything reached the backlog.
  1. 01

    Desk research

    Contact-rate data analysed with AI, then interviews. Five pains found, one chosen as focus.

    User perspective
  2. 02

    Benchmark

    With Mastercard, the essential card features in Brazil: the “Impeccable Basics”.

    Market perspective
  3. 03

    Ideation

    A workshop with leadership. Ideas ranked with a framework adapted from IDEO.

    Team and leadership
  4. 04

    Prototyping

    Low fidelity with engineering, high fidelity in usability tests.

    Engineering, then customers
  5. 05

    Deliveries

    A predictable open bill first, then the past and the future.

    Backlog
  6. 06

    Impact

    A controlled rollout, measured against a control group.

    Test vs. control

02 · Discovery

I read the support tickets first, then interviewed customers.

I used an LLM to classify chat transcripts by cause and measure what the old brain was costing us in operations. Then I interviewed customers who had opened chats, to understand what those tickets meant in their lives.

I use future bills to plan my purchases, but with this bank I need an Excel spreadsheet. It’s archaic.

Customer interview

I paid, tried to use the card and couldn’t, even with the app saying everything was normal.

Customer interview

You see the bill one day and set the money aside. On the due date the amount is different, because an instalment you thought was included shows up.

Customer interview
Contact-rate data (analysed with AI) × interviews Five pains. One made people think about dropping the card.
  1. Bills they couldn’t predict our focus
  2. Services unavailable
  3. Trouble paying the bill
  4. Bills closing late
  5. No way to pay instalments early

For customers who budget down to the last cent, a bill that changes after they set the money aside is a reason to stop using the card.

In the interviews, customers described the bill as their budget, and not only this month’s. They look at paid bills to see what they spent, check the open one to set money aside and count the instalments for the coming months before buying again. Customers think about the bill over time, and our card only showed the present.

Worse, even the present wasn’t reliable. Purchases still being processed weren’t added to the open bill, and instalments from earlier months only appeared after the bill had opened.

The mental model · how customers read the bill The open bill is the budget. The old brain showed only part of it.
BeforeThe bill you planned for wasn’t the bill you paid
AfterYou pay the bill you see

Simulation with fictional amounts. Instalments from earlier months had the same gap, and became the second delivery.

03 · Market and ideas

We compared our card with what the market already offers.

With Mastercard, I mapped what every card in Brazil is expected to do, and looked for what ours was missing.

Benchmark + ideation Mastercard’s “Impeccable Basics”, then a workshop with the team and leadership.

We started from what the market already offers. With Mastercard, we mapped the features every credit card in Brazil is expected to have, a list Mastercard calls “The Impeccable Basics”. Then we took the research and the market data to a workshop with the team and leadership, and ranked the ideas with a framework adapted from IDEO: what the business needs, what customers expect and what the new authorizer could do.

Framework: customer expectations, business needs and technical feasibility overlap on what we built: a real-time open bill and every instalment from day one. Customerwhat people expect Businesswhat will bank needs Technologywhat the new authorizer can do BUILD
Build Real-time open billEvery instalment from day one

The workshop gave us a direction we called Temporal Control: customers needed to see the past, the present and the future of their bill, and act on them. The order became clear there too. No one plans the coming months on a bill that keeps changing, so the present came first.

The past

Closed bills

Everything already charged, with no surprises.

The present

The open bill

Updated in real time, every purchase and every instalment included.

The future

Future bills

What’s already committed for the coming months, so no one needs a spreadsheet to plan.

“Temporal Control”: the direction that came out of the workshop. Each part became a delivery.

04 · The present

First, an open bill people could trust.

I built low-fidelity prototypes to refine the solution with engineering, since everything depended on what the new authorizer could do. The high-fidelity versions went to usability tests with customers, to reduce implementation risk before anything was built.

credit card

How it was

Pending purchases were missingPurchases still being processed weren’t added to the open bill, so the amount on screen was out of date.
Bills opened incompleteWhen a new bill opened, instalments from earlier purchases didn’t show up yet. The amount changed later.

How it is now

Real-time open billEvery authorised purchase is added at once, so the amount on screen is always the real one.
Every instalment, from day oneA new bill opens with every instalment from previous months already in it. Not every card in Brazil does that.

The second feature came straight out of Mastercard’s “Impeccable Basics”. Not every card in Brazil opens the bill with every instalment from previous months already included, so closing our own gap also gave us a point of difference.

05 · Past and future

Then, the rest of the bill’s timeline.

With the authorizer in-house, the bank knew in real time what fell on each bill, including the ones that hadn’t opened yet. That made the rest of Temporal Control possible, on three fronts I designed with the team.

Bills over time. A timeline of months opens the bills area. Paid bills sit in the background, the open one stands out and the upcoming ones follow, each with its amount so far. Tapping a month shows what’s in it, including instalments still to come. People who used a spreadsheet to plan could now see the coming months in the app.

bills

Paying instalments early, with a discount. It was one of the five pains from the research. From an upcoming bill, people pick which future instalments to pay now, and the further away the instalment, the bigger the interest discount. Before confirming, they see how much they save and which bill the amount goes to. Paying by Pix frees the limit at once, because authorisation is now ours.

pay early

Planning before buying. The last front looks at the next purchase. The simulation shows how each future bill looks with the new purchase, and the calendar explains the bill cycle without jargon: when it closes, the best day to buy and when it’s due. When changing the due date, each day already shows the new best day to buy.

plan ahead

At the time, not every bank in Brazil gave people this control in the app. Complete future bills, early payment with a discount in a few taps and a limit freed on the spot became points of difference for our card, all from a project that started as infrastructure.

The order of delivery

We started with the present because no one plans the coming months on a bill that keeps changing. The past and the future came after.

One lesson

Prioritise what users ask for, and also what competitors don’t offer yet.

06 · Impact

Measured against a control group.

Everything shipped in a controlled rollout, with a test group compared against a control group. I also worked with other teams so they could use the new authorizer in their own products.

Impact · test group vs. control group

An infrastructure migration gave customers control over their bill’s timeline.

A/BRolled out against a control group
CSAT & NPS ↑Higher in the test group than in control
Contacts ↓Fewer tickets in the test group
Controlled rollout, planned as an A/B testFeatures not every card in Brazil offeredAn authorizer other teams built on

07 · Why it matters

I found a product inside an infrastructure project.

What I’d keep
  • Reading the tickets before the interviews: the contact-rate data said where it hurt, the customers said why
  • Shipping the two basics first. A predictable bill was what made the rest of Temporal Control useful
What I’d change
  • Treat the migration as a product opportunity before the engineering plan was set
  • Compare test and control on bill-related contacts only, so the result can be tied to the change
01Saw a product in an infrastructure ticketA back-end migration became a chance to fix what customers complained about most.
02Let the data pick the painChat transcripts classified by cause, then interviews to understand what the biggest one meant.
03Benchmarked before inventingWith Mastercard, mapped what every card in Brazil is expected to do, and found our gap.
04Prototyped with engineering firstLow fidelity first, because everything depended on what the new authorizer could do.
05Measured the resultA gradual rollout, with the test group compared to a control group.
06Turned a migration into a roadmapTemporal Control shipped, and other teams built on the same authorizer.
Next case · Acordo Certo Acordo Certo: making a debt-negotiation platform feel safe enough to start